1

n an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The G and N codes for this motion are

Correct Answer: N010 GO2 X7.0 Y2.0 I5.0 J2.0

Make the most of this question

This page focuses on one CAD-CAM and Automation question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

CAD-CAM and Automation MCQ: n an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The G and N codes for this motion are | Extra Education