1

Normally pre-stressing wires are arranged in the

Correct Answer: lower part of the beam

Make the most of this question

This page focuses on one Concrete Technology and Design question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Concrete Technology and Design MCQ: Normally pre-stressing wires are arranged in the | Extra Education