1

For repair works at high level of multistoreyed buildings needle scaffolding is preferred

Correct Answer: As it will not obstruct traffic at ground level.

Make the most of this question

This page focuses on one Construction Project Management question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Construction Project Management MCQ: For repair works at high level of multistoreyed buildings needle scaffolding is preferred | Extra Education