1

In CBR test, the value of CBR is calculated at

Correct Answer: both 2.5 and 5 mm penetration

Make the most of this question

This page focuses on one Highway Engineering question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Highway Engineering MCQ: In CBR test, the value of CBR is calculated at | Extra Education