1

Which of the following is incorrect with reference to work study?

Correct Answer: Normal time = Representative time x Rating factor

Make the most of this question

This page focuses on one Industrial Engineering question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Industrial Engineering MCQ: Which of the following is incorrect with reference to work study? | Extra Education