1

When conducting an immersion test, the water path distance must be controlled so that:

Correct Answer: The test piece discontinuity indications appear between the first front and first back surface echos

Make the most of this question

This page focuses on one Non Destructive Testing and Evaluation question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Non Destructive Testing and Evaluation MCQ: When conducting an immersion test, the water path distance must be controlled so that: | Extra Education