1

is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

Correct Answer: plinth area estimate

Make the most of this question

This page focuses on one Process Planning and Cost Estimation question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Process Planning and Cost Estimation MCQ: is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality. | Extra Education