1

The design period for a water supply project is taken as ?

Correct Answer: 20 to 30 year

Make the most of this question

This page focuses on one Public Health Engineering question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Public Health Engineering MCQ: The design period for a water supply project is taken as ? | Extra Education