1

Objects placed in an Activity Diagram are connected to the activity or transition using ________ relationship

Correct Answer: association

Make the most of this question

This page focuses on one Software Design Modeling (SDM) question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Software Design Modeling (SDM) MCQ: Objects placed in an Activity Diagram are connected to the activity or transition using ________ relationship | Extra Education