1

Basic execution time model was developed by

Correct Answer: Victor Baisili

Make the most of this question

This page focuses on one Software Engineering question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Software Engineering MCQ: Basic execution time model was developed by | Extra Education