1

Which model can be selected if user is involved in all the phases of SDLC?

Correct Answer: rad model

Make the most of this question

This page focuses on one Software Engineering question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Software Engineering MCQ: Which model can be selected if user is involved in all the phases of SDLC? | Extra Education