1

Cost required for developing the right product by right method at the first time is called as:

Correct Answer: cost of manufacturing

Make the most of this question

This page focuses on one Software Testing and Quality Assurance (STQA) question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Software Testing and Quality Assurance (STQA) MCQ: Cost required for developing the right product by right method at the first time is called as: | Extra Education