1

When the curve is to be set out over a rough ground, the method used is ?

Correct Answer: either (b) or (c)

Make the most of this question

This page focuses on one Surveying question from Engineering. After checking the answer, return to the topic list to practice more or run a timed set.

Surveying MCQ: When the curve is to be set out over a rough ground, the method used is ? | Extra Education