1

The daily wages of A and B respectively are Rs.3.50 and Rs.2.50. When A finishes a certain work, he gets a total wage of Rs.63. When B does the same work, he gets a total wage of Rs.75. If both of them do it together what is the cost of the work ?

Correct Answer: Rs.67.50