1

The term……………..is defined as a system that ensures the provision of the required quantity of material of the required quality at the required time with the minimum amount of capital.

Correct Answer: Material Control

Make the most of this question

This page focuses on one Cost and Works Accounting 1 question from Faculty. After checking the answer, return to the topic list to practice more or run a timed set.

Cost and Works Accounting 1 MCQ: The term……………..is defined as a system that ensures the provision of the required quantity of material of the required quality at the required time with the minimum amount of capital. | Extra Education